Both documents are editions of the Health and Safety Executive (HSE) publication L143: Managing and working with asbestos (Control of Asbestos Regulations 2012 – Approved Code of Practice and guidance), containing the core Regulations, Approved Code of Practice (ACOP) text, and guidance on managing and working safely with asbestos. However, they represent different editions separated by over a decade and reflect important updates, most notably a November 2026 amendment to Regulation 20 regarding analyst independence during four-stage site clearance.
Edition Overview and Scope
Feature | L143 (Second Edition, 2013) | L143 (Third Edition, 2026) |
Edition & Year | Second edition, published 2013 (Notice of Approval dated 19 December 2013) | Third edition, published 2026 |
ISBN | 978 0 7176 6618 8 | 978 0 7176 6847 2 |
Core Content | Control of Asbestos Regulations 2012, ACOP (consolidating former L127 and L143), and guidance | Control of Asbestos Regulations 2012 (including the November 2026 amendment to Regulation 20), ACOP, and guidance |
Document Completeness | Full 116-page text through to final references and further information | Extracts/pages running into Regulation 17 (around paragraph 445, mid-Stage One of site clearance), with the 2026 edition's front matter noting the Nov 2026 change |
Key Content Differences
1. Site Clearance & Analyst Independence (Regulation 20 & Regulation 17)
The most substantive legal and operational shift highlighted in the third edition involves who appoints the analyst for site clearance certification:
Second Edition (2013): Under Regulation 20(4), employers requesting a site clearance assessment had to ensure the person was accredited to ISO 17020 and ISO 17025. In the accompanying ACOP/guidance (paragraphs 432–433), having the building owner/occupier employ the analyst rather than the removal contractor was described as desirable to avoid real or perceived conflicts of interest, rather than a legal prohibition on contractor appointment.
Third Edition (2026): The introductory overview explicitly notes that Regulation 20 was amended in November 2026 to strengthen impartiality in the four-stage clearance process, meaning the analyst for site clearance certification must not be appointed by the contractor(s) carrying out the asbestos removal work. Correspondingly, ACOP paragraph 432 in the third edition states that Regulation 20(4) requires the employer (licensed contractor) responsible for thorough cleaning under regulation 17(b) not to appoint the analyst carrying out the four-stage clearance.
2. Enforcing Authorities (Regulation 9)
In the guidance on identifying the appropriate enforcing authority for notifications (Table 7 and paragraph 222):
Second Edition (2013): Lists LA (Local Authority), HSE, and ORR (Office of Rail Regulation), noting "All three enforcing authorities" for NNLW notifications.
Third Edition (2026): Updates the railway entry to ORR (Office of Road and Rail) and adds ONR (Office of Nuclear Regulation) to Table 7 and paragraph 222.
3. External References, Links, and Terminology
CDM Regulations (Regulation 3, paragraph 80): The 2013 edition cites the Construction (Design and Management) Regulations 2007, whereas the 2026 edition updates this reference to the Construction (Design and Management) Regulations 2015.
Plan of Work Resources (Regulation 7, paragraph 200): The 2013 edition points to HSE's Asbestos Licensing Group pages, while the 2026 edition directs readers to the CONIAC Asbestos Network website.
HSE Risk Guidance Link (Regulation 3, paragraph 78): The 2013 edition links to www.hse.gov.uk/risk/faq.htm, whereas the 2026 edition updates this URL to [https://www.hse.gov.uk/simple-health-safety/risk/steps-needed-to-manage-risk.htm](https://www.hse.gov.uk/simple-health-safety/risk/steps-needed-to-manage-risk.htm).
Publishing & Minor Wording Updates: The 2026 edition reflects His Majesty's Stationery Office ("His Majesty's Navy" instead of "Her Majesty's Navy" in Regulation 3(5), TSO contact details, and minor stylistic edits such as removing some Oxford commas or parentheticals in guidance text).
Where They Are Identical
Across the shared regulations and guidance sections—covering Regulations 1 to 17 (definitions, licensable vs. non-licensable/NNLW work, duty to manage in non-domestic premises, identification, risk assessments, plans of work, licensing, notifications, training, exposure controls, RPE/PPE, emergencies, enclosures, decontamination, and cleanliness)—the underlying legal framework, exposure limits (0.1 fibres/cm³ over 4 hours control limit; 0.6 fibres/cm³ over 10 minutes for sporadic and low-intensity exposure), and practical ACOP standards remain consistent.